Little League Light Foam Pole Setting

Setting and Stabilizing 75′ lighting poles for a little league baseball park using Strata-Fill 24-018 polyurethane.

About This Project

Contractor

Elite Contract Lifters

Location

Broadway, VA

Product Used

Strata-Fill™ 24-018

Learn More About Strata-Fill™ 24-018

Explore Product

In Broadway, VA the construction of a new little league baseball field was nearing completion and it was time to install the new 75ft tall lighting poles. The contractor, Elite Concrete Lifters worked with the City on specifying the 24-018 Pole Setting polyurethane system by helping them understand how the polymer’s quick cure times and compressive strength would minimize installation times and costs. The 24-018 is a 4.8 pcf dual component polyurethane foam system that was specifically designed as a replacement for concrete. The 75′ tall poles were installed by utilizing a crane to position them in 10’ deep x 2 ½’ wide pre-drilled holes. When the pole was in place, the 24-018 components were hand mixed and poured into the hole. Once combined, the components bind and begin to expand throughout the hole, filling the voids horizontally and vertically around the pole. The polymer cures much faster than concrete and the crane was able to let go and move to the next location after approximately 20 minutes. The 24-018’s cure time helped the City complete the pole installation in 2 days saving the City time and money while helping light the fields for young baseball players for years to come. Learn more about the 24-018 Pole Setting Foam.

Project Gallery

See More Case Studies

Other

Dual-Component Systems

Geotechnical

Northwestern University Retaining Wall Sealing

Discover how Lincoln Company LLC was called in to seal a retaining wall with NCFI Geotechnical Polyurethanes.

Read More

Concrete Leveling

Dual-Component Systems

Geotechnical

Ram Jack Arizona uses NCFI TerraThane 24-003 to Stabilize 47 Rocking Slabs

Ram Jack Arizona used NCFI TerraThane 24-003 to stabilize the joints of 47 slabs, completing the initial phase of the project in approximately 12 hours.

Read More

Transportation

Dual-Component Systems

Geotechnical

North Dakota I-20 and 94 Highway Slab Lift

Erosion underneath concrete slab highway was creating unsightly and potentially dangerous driving conditions requiring a lift under I-29 and Highway 94

Read More

We Have Partnership Down to a Science

We understand the challenges you face, and we’re here to help. Reach out today, and let's work together to find the best solution tailored to your needs with the highest-quality polyurethane foam products available.