Florida Seawall Foam Repair using Terra-Lok™ 24-120 Single-Component System

Check out our Seawall Foam Repair video displaying the Seawall Soil Stabilization process using the Terra-Lok™ 24-120 Single-Component Polyurethane System.

About This Project

Contractor

Florida Marine Builders | Pro Foam, Inc

Location

Atlantic Coast Florida

Product Used

Terra-Lok™ 24-120

Learn More About Terra-Lok™ 24-120

Explore Product

Florida Marine Builders faced the challenge of stabilizing and filling the seawall voids in Florida. They turned to the innovative seawall foam repair solution using the NCFI Terra-Lok™ 24-120 Single Component Polyurethane, along with the Terrapin™ All-Terrain Single Component Work Station and technical guidance from Pro Foam.

The goal was to repair and reinforce the Florida seawall by utilizing the unique properties of the NCFI Terra-Lok™ Polyurethane. The aim was to achieve complete stabilization and fill voids or cracks within the soil and seawall structure.

The process involved injecting the NCFI Terra-Lok™ 24-120 Single Component Polyurethane into targeted depths where loose soil and voids were present. The polyurethane’s low viscosity allowed it to effectively permeate the soil. Once injected, the polyurethane reacted with moisture, expanding and compacting the soil.

The seawall foam repair injections followed a gradual upward trajectory to ensure comprehensive coverage and treatment. Weak locations along the entire length of the seawall were selected for injection, focusing on areas prone to cracks, voids, and loose joints.

The implementation of NCFI Terra-Lok™ Polyurethane yielded successful outcomes for Florida Marine Builders. The injections resulted in a fully stabilized and compacted soil layer, effectively sealing cracks, voids, and loose joints within the seawall structure. The video presentation showcased the injection patterns, a graphic illustrating the process of single component permeation grouting, and the before-and-after results of seawall repair using polyurethane foam.

Through the strategic use of NCFI Terra-Lok™ 24-120 Single Component Polyurethane, along with the support of the Terrapin™ All-Terrain Single Component Work Station and technical expertise from Pro Foam, Florida Marine Builders achieved their seawall stabilization objectives. The project demonstrated the effectiveness of polyurethane injection for repairing and reinforcing seawalls, ensuring structural integrity and longevity.

Project Gallery

See More Case Studies

Other

Dual-Component Systems

Geotechnical

Northwestern University Retaining Wall Sealing

Discover how Lincoln Company LLC was called in to seal a retaining wall with NCFI Geotechnical Polyurethanes.

Read More

Other

Lightweight Fill Systems

Geotechnical

Little League Light Foam Pole Setting

Setting and Stabilizing 75′ lighting poles for a little league baseball park using Strata-Fill 24-018 polyurethane.

Read More

Concrete Leveling

Dual-Component Systems

Geotechnical

Ram Jack Arizona uses NCFI TerraThane 24-003 to Stabilize 47 Rocking Slabs

Ram Jack Arizona used NCFI TerraThane 24-003 to stabilize the joints of 47 slabs, completing the initial phase of the project in approximately 12 hours.

Read More

We Have Partnership Down to a Science