Port of Seattle Stormwater Rehabilitation

Port of Seattle was experiencing severe settlement in its stormwater conveyance system.

About This Project

Contractor

SlabJack Geotechnical

Location

Seattle, WA

Product Used

Terrathane™ 24-003

Learn More About Terrathane™ 24-003

Explore Product

The port of Seattle was experiencing severe settlement in its stormwater conveyance systems that were adjacent to its seawalls. The 5 outfalls and culvert pipes had formed large annular voids due to severe inflow and infiltration (I&I) that was degrading the support soils which consisted of fine silty loam soils and sands. The diameter of the pipes ranged between 16-42 inches and lengths between 22-65 feet. The depths varied between -10 to -15 ft.

The contractor, SlabJack Geotechnical, approached the project using the TerraThane 24-003 to fill the voids around the outfalls and pipes, seal the joints, and stabilize and densify the support soils. With access restrictions due to the pipe diameter, SlabJack injected the polyurethane laterally down the length of the pipe at the 2 and 10 o’clock positions from the seawall outfall and from access manholes. The injection rods were inserted lengthwise down the pipe and cut to varying lengths to provide injection zones at every 5ft.

In areas where soil densification was required, this was especially important at the pipe bellies, SlabJack Geotechnical inserted rods at angled positions to create a multiple depth injection to effectively rehabilitate the soils against future settlement.

The project took 18 days to complete, a schedule which consisted of working around tide schedules and port operations. It was finished on budget and within the port’s schedule. In total, SlabJack Geotechnical used 12,250 lbs of 24-003 to complete the project. They ensured the project’s success with pre and post CCTV inspections and removed any polyurethane tailings and screened all material from entering the ecosystem.

Project Gallery

See More Case Studies

Other

Dual-Component Systems

Geotechnical

Northwestern University Retaining Wall Sealing

Discover how Lincoln Company LLC was called in to seal a retaining wall with NCFI Geotechnical Polyurethanes.

Read More

Other

Lightweight Fill Systems

Geotechnical

Little League Light Foam Pole Setting

Setting and Stabilizing 75′ lighting poles for a little league baseball park using Strata-Fill 24-018 polyurethane.

Read More

Concrete Leveling

Dual-Component Systems

Geotechnical

Ram Jack Arizona uses NCFI TerraThane 24-003 to Stabilize 47 Rocking Slabs

Ram Jack Arizona used NCFI TerraThane 24-003 to stabilize the joints of 47 slabs, completing the initial phase of the project in approximately 12 hours.

Read More

We Have Partnership Down to a Science

We understand the challenges you face, and we’re here to help. Reach out today, and let's work together to find the best solution tailored to your needs with the highest-quality polyurethane foam products available.