Discover how Slabjack Geotechnical stabilized a sinking tilt-up panel building in Everett, Washington, using innovative deep injection techniques and polyurethane foam.
SlabJack Geotechnical
Everett, WA
Terrathane™ 24-042
When subsidence threatened a modern tilt-up panel building in Everett, Washington, Slabjack Geotechnical stepped in with innovative polyurethane solutions and unmatched expertise. Here’s how they tackled this challenging project and ensured the building’s stability for the future.
In Everett, a two-year-old tilt-up panel building faced serious issues. The structure featured a 30-foot fill CMU block retaining wall and had settled by 2.5 inches. The subsidence posed a risk to critical utilities, which had also begun to settle, necessitating immediate intervention.
Initially, compaction grouting was recommended to a depth of 35 feet. However, soil tests revealed low blow counts, indicating poor soil compaction. To address this, the depth was increased to 50 feet to ensure thorough stabilization and effective results.
Slabjack’s approach was meticulous:
The injection utilized NCFI Terrathane™ 24-042, a high-density 3.5lb polyurethane known for its slow reactivity, optimal spread, and excellent structural support. The targeted areas included:
The top-down injection method proved highly effective, stabilizing the footer, drive lane, utilities, and retaining wall. Polyurethane outcroppings at 30 feet along the retaining wall confirmed successful penetration and stabilization.
An independent engineer verified that the settlement had ceased, showcasing the success of Slabjack’s intervention. Impressively, the entire project was completed within 14 business days by a skilled three-man team, with an additional two-man team brought in during the final phase.
Location: Everett, Washington
Issue: 2.5″ settlement affecting the building, retaining wall, and utilities
Duration: 14 business days
Team: 3-man team, with an additional 2-man team in the final phase
Total Polyurethane Injected: 50,000 lbs
Slabjack Geotechnical’s innovative techniques and dedicated execution turned a potentially disastrous situation into a triumph. Their deep injection strategy with NCFI Terrathane™ 24-042 not only halted the settlement but also reinforced the building’s structural integrity. This project is a shining example of how Slabjack’s expertise and ingenuity can tackle even the most daunting geotechnical challenges.
Discover how Lincoln Company LLC was called in to seal a retaining wall with NCFI Geotechnical Polyurethanes.
Read MoreSetting and Stabilizing 75′ lighting poles for a little league baseball park using Strata-Fill 24-018 polyurethane.
Read MoreRam Jack Arizona used NCFI TerraThane 24-003 to stabilize the joints of 47 slabs, completing the initial phase of the project in approximately 12 hours.
Read MoreWe understand the challenges you face, and we’re here to help. Reach out today, and let's work together to find the best solution tailored to your needs with the highest-quality polyurethane foam products available.