TXDOT Highway Rehabilitation and Leveling

Potholes, settled roadway and bridge approach slabs, dips, caused by a variety of problems such as soil subsidence, vibration, washout, poor base soils

About This Project

Contractor

Nortex

Location

Houston, TX

Product Used

Terrathane™ 24-003

Learn More About Terrathane™ 24-003

Explore Product

Problem

  • Extensive repairs were needed in Houston’s NE quadrant where I-10, the 610 Loop, I-59 and I-69 feed into Harris County
  • The issues were potholes, settled roadway and bridge approach slabs, dips, caused by a variety of problems such as soil subsidence, vibration, washout, poor base soils, necessitating highway rehabilitation and leveling

Solution

  • Foamjack with TerraThane™ geotechnical polyurethane to void fill, stabilize, lift and realign the slabs
  • Create smooth driving paths by identifying key problem areas and designing an injection plan to meet goals, whether void-filling or concrete lifting
  • Minimize disruption to highway system by working during non-peak hours

Results

  • Over half a million pounds of TerraThane 24-003 Polymer was injected in over 150 locations
  • Minimal impact was made to traffic as work was performed during the evening hours
  • Because of the fast-curing polymer, the work area was continuously advancing, because traffic could utilize the roadway within minutes of installation

Project Gallery

See More Case Studies

Other

Dual-Component Systems

Geotechnical

Northwestern University Retaining Wall Sealing

Discover how Lincoln Company LLC was called in to seal a retaining wall with NCFI Geotechnical Polyurethanes.

Read More

Other

Light-Weight Fill Systems

Geotechnical

Little League Light Foam Pole Setting

Setting and Stabilizing 75′ lighting poles for a little league baseball park using Strata-Fill 24-018 polyurethane.

Read More

Concrete Leveling

Dual-Component Systems

Geotechnical

Ram Jack Arizona uses NCFI TerraThane 24-003 to Stabilize 47 Rocking Slabs

Ram Jack Arizona used NCFI TerraThane 24-003 to stabilize the joints of 47 slabs, completing the initial phase of the project in approximately 12 hours.

Read More

We Have Partnership Down to a Science