Riverfront Convention Center Concrete Floor Lift
12-year-old New Bern Riverfront Conference Center’s floors were settling due to an old riverbed subsiding and needed to be lifted

About This Project
Contractor
Keller-Hayward Baker
Location
New Bern, NC
Product Used
Terrathane™ 24-003
Learn More About Terrathane™ 24-003
Explore ProductGet Started with NCFI
See More Case Studies

Northwestern University Retaining Wall Sealing
Discover how Lincoln Company LLC was called in to seal a retaining wall with NCFI Geotechnical Polyurethanes.
Read More
Little League Light Foam Pole Setting
Setting and Stabilizing 75′ lighting poles for a little league baseball park using Strata-Fill 24-018 polyurethane.
Read More
Ram Jack Arizona uses NCFI TerraThane 24-003 to Stabilize 47 Rocking Slabs
Ram Jack Arizona used NCFI TerraThane 24-003 to stabilize the joints of 47 slabs, completing the initial phase of the project in approximately 12 hours.
Read MoreWe Have Partnership Down to a Science
We understand the challenges you face, and we’re here to help. Reach out today, and let's work together to find the best solution tailored to your needs with the highest-quality polyurethane foam products available.